Browse Categories
Stainless steel balustrade & fittings(1102)
Swimming pool fence hardwares(1045)
Slot handrail tubing &Fittings(195)
Railing Project Galary(190)
Aluminum U channel glass railing system(4)
Tempered Glass(6)
Shower door hinge(2)
OEM(32)
Aluminum post & Fittings(0)
Curtain Wall Glass Spider Fittings(1)
Certifications
CCC Certificate
Contact us
Shenzhen Launch Co., Ltd Office add : B5-003, 5/F-Block 3, Yilida Building, No. 1092 Nanshan Road, NanshanDistrict,Shenzhen , China , postal code 518...Contact Now
Stainless steel handrail post for modern design glass balustradeStainless steel handrail post for modern design glass balustradeStainless steel handrail post for modern design glass balustrade

Stainless steel handrail post for modern design glass balustrade

  • Material: stainless steel 304/316
  • Finish: mirror/satin
  • Standard hight: 1100mm or as per your requirement
  • Type: round/square/side mounted
  • Sample: available
  • MOQ: one pc
  • Payment: T/T, PayPal, Western Union
  • Seaport: Shenzhen
1.Desciption 
--Staniless steel handrail post for modern design glass balustrade 
--Roud post size: φ43mm or φ50.8mm, 1100mm high or as per your requirement 
--Square post size: φ40x40mm or 50x50mm, 1100mm high as per your requirement
--If need top rail: round top rail size: φ43mm or φ50.8mm/square top rail size: 50x25mm 
--If don't need top rail: will use end cap. 
--Glass clamp can be mached according to glass thickness.(Normally 8-12mm glass ) 
--Glass to ground distance: 50mm 
--If glass >1200mm,  fixing into ground safer post is recommend. 

2. Product picture 



LCH-106 round end post 

LCH-107 round middle post 180 degree


LCH-108 90 round degree corner post 

LCH-121 round side mount post 


LCH-103 square end post 

LCH-104 square middle post 180 degree

LCH-105 square 90 degree corner post 


New design spider post with glass standoff 





3.Project show 

With top rail on top 





With end cap on top 





We also suppli tempered glass 


3.Details 





4.Delivery & Packing  
Delivery: 3-5 days by express. 10-15 days by shipping 
Packing: one pc into one plastic bag, then into one box. 
Lead time: about 20 days after payment. ( It depent on quantity) 






5. Factory & Certification 





6.Customers 



7.Contact


Thank you for visiting. Please do not heasite to contact us for factory direct price and professional advises.



Shenzhen Launch Co.,Ltd

Tel:86-13530506265

Contact Person:Doris Dong

Send your inquiry directly to us
show code on cursor in the input box
( 0 / 3000 )